Skip to main content

This consultation ended 31 October 2013.

Consultation period:
28 July 2013 to 31 October 2013
Last updated:

Details of outcome

Summary of responses , file type: PDF, file size: 523 KB

PDF
523 KB
If you need a more accessible version of this document please email digital@gov.wales. Please tell us the format you need. If you use assistive technology please tell us what this is.

Full responses , file type: PDF, file size: 5 MB

PDF
5 MB
If you need a more accessible version of this document please email digital@gov.wales. Please tell us the format you need. If you use assistive technology please tell us what this is.

Original consultation

We want your views on changes to permitted development rights to help facilitate the required infrastructure in Wales to ensure access to next generation broadband.

Consultation description

We want your comments on proposed changes to the permitted development rights set out in Part 24 “Development by Electronic Communications Code Operator (Wales)” of Schedule 2 to the Town and Country Planning (General Permitted Development) Order 1995 (S.I. 1995/418) as amended.

The consultation paper is arranged in 4 main sections:

  • telecommunications infrastructure in Wales 
  • fixed broadband roll-out 
  • mobile broadband roll-out
  • the proposed modifications to current permitted development rights and some related issues.    

Annex 2 contains a draft Regulatory Impact Assessment.

Consultation documents

Consultation document , file type: PDF, file size: 366 KB

PDF
366 KB
If you need a more accessible version of this document please email digital@gov.wales. Please tell us the format you need. If you use assistive technology please tell us what this is.