Interim Advice Note 53/04 – Concrete Half-Joint Deck Structures

The content of this page is not being updated. Get up to date information on interim advice note 53/04 at beta.gov.wales.

Related Links

Tell us if you want any of the documents on this page in an alternative format.
This Interim Advice Note (IAN) implements an Interim Management Strategy for reinforced concrete and steel/concrete composite half-joint deck detailing in suspended span and propped-cantilever bridges.

The risk based strategy is necessary to ensure that all structures of this type, which are particularly vulnerable to deterioration and difficult to inspect, are recorded, specially inspected, and remedial works planned, and to allow the future maintenance funding requirements to be identified.