Optimised RetroFit Programme 2.2: funded projects
Projects funded by the scheme for upgrades to the energy efficiency of homes.
This file may not be fully accessible.
|
Organisation |
Local Authority Project Location |
Project Description |
Number of Homes |
Grant £ |
Registered Social Landlord (RSL) |
Barcud |
Powys |
Improve thermal performance and reduce carbon emissions – thus addressing both affordable warmth and decarbonisation. |
7 |
66,340 |
RSL |
Barcud |
Powys |
Retrofitting External Wall Insulation; replacing poor window units with new double glazed high performance units; replacing old storage heaters with new controllable high heat retention and panel units; installing solar PVs to benefit each property; providing intelligent hot water cylinders which are heated in the first instance by the solar PV panels Installing new, substantial, insulation within the roof space; Replacing the roof tiles to enable the integrated solar PV installation |
23 |
543,000 |
Local Authority (LA) |
Carmarthenshire |
Carmarthenshire |
Improve the thermal qualities of the building and flats are heated by mains gas. Building on the research previously done by WG and the WSA, combined with a major RMI program and explore the possibility of community/ combined low carbon heating sources. |
32 |
616,289 |
LA |
Carmarthenshire |
Carmarthenshire |
Supported living project that will provide low carbon, low cost housing for vulnerable people that share or live independently. |
8 |
264,000 |
LA |
Carmarthenshire |
Carmarthenshire |
E Grade Boiler upgrades to Hybrid Systems |
50 |
685,000 |
RSL |
Clwyd Alyn |
Flintshire, Denbighshire, Conwy, Wrexham, Ynys Mon, |
ClwydAlyn currently has a small proportion of homes with an EPC rating of E,F,G. These homes are not energy efficient, causing our residents to pay more for fuel to keep their homes warm and comfortable. We would like to install IES systems into these homes and carry out measures to ensure the fabric first approach is carried out. |
152 |
198,400 |
LA |
Denbighshire |
Denbighshire |
Energy measures to our off grid, hard to treat sheltered housing, works would follow a fabric first approach; EWI uplift to our already proposed RMI 16mm dash render works, new roof and roofline, Solar thermal (priority hot water and if enough capacity; space heating using the existing radiators, heat pump ready) and PV/battery to offset higher electricity costs. We’d like to pilot this scheme to see how efficient todays solar thermal cylinders perform. |
10 |
222,821 |
LA |
Denbighshire |
Denbighshire |
Works to offer the residents in a village a district heating system, village is a manageable size to pilot a scheme as the houses cluster, are hard to heat as fabric works are a challenge due to the traditional welsh vernacular. Houses in this village have poor E/F/G EPC ratings |
40 |
671,000 |
LA |
Denbighshire |
Denbighshire |
New roofs and roof line, PV and battery, EWI uplift where we would normally 16mm dash render and insulate the suspended timber floors (where practical) + Whole house assessments and passports. These properties already have IES sensors monitoring the building physics as they currently perform. We will offer residents the ‘City and Guilds’ energy awareness course, upskill our DLO’s and local subcontractors in PV and battery installation. |
17 |
343,796 |
LA |
Flintshire |
Flintshire |
Affordable Green homes, the scheme will deliver a comprehensive fabric first retrofit. After establishing the existing baseline through IES data testing, based on current usage and performance, a series of bespoke and innovative measures will be implemented and monitored based on stock typology. |
196 |
2,984,922 |
RSL |
Linc Cymru, Bron Afon, Cadwyn, Melin, United Welsh |
South East Wales |
Climate Collective Climate collective - The scheme is a collaboration of RSLs and 11 external partners that are sharing learning, skills and resources to collectively drive optimised retrofit action across 4 linked themes:
|
344 |
4,267,220 |
RSL |
Taff |
Cardiff |
Putting Tenants at the Heart of decarb |
20 |
50,000 |
LA |
Wrexham |
Wrexham |
The scheme is to retrofit 2 sheltered housing schemes with renewable technology to improve the energy efficiency of the properties. |
43 |
408,114 |
LA |
Wrexham |
Wrexham |
Retrofit Pilot scheme, refurbishment and retrofit of 12 empty properties across the Borough. Works to exceed the current version of WHQS, each property will be installed with Intelligent Energy Systems to allow evaluation and monitoring to ensure optimum benefits and impacts are realised for use in future work programmes. |
12 |
440,100 |
RSL |
Aelwyd |
Rhondda Cynon Taff |
Installation of solar PV with battery storage, IES Monitoring and upgraded replacement window |
8 |
37,242 |
RSL |
Aelwyd |
Rhondda Cynon Taff |
Installation of solar PV with battery storage, IES Monitoring and upgraded replacement window |
15 |
77,292 |
RSL |
Bro Myrrdin |
Carmarthenshire |
The scheme is made up of 33 properties with a mixture of houses and bungalows predominantly heated by electricity. The majority of properties selected are termed as ‘off grid’ regarding mains gas and are of a traditional construction type. The property ages ranges from 120 to 30 years and are in a well maintained condition |
33 |
405,000 |
RSL |
Caredig |
Carmarthenshire, Swansea |
PV with Battery |
30 |
299,550 |
RSL |
CCHA |
Cardiff |
The scheme is based on the commencement of decarbonising 29 homes in Cardiff by installing External Wall Insulation, triple glazed windows, new external doors, new roofs, PV and battery storage (including IES), electrical upgrades and loft insulation. |
29 |
902,500 |
RSL |
Clwyd Alyn |
Wrexham |
install IES’ in each home and communal area to capture live data on low performing homes and resolve cold bridging and heat loss into communal areas |
59 flats and 18 houses |
222,150 |
RSL |
Coastal |
Swansea , Neath |
Embodied & Construction Carbon Assessment. To undertake assessment for either EWI or IWI and provide retrofit in accordance with PAS2035 |
16 |
229,000 |
RSL |
Coastal |
Swansea , Neath |
PV & Electric Heating Upgrades |
40 |
238,000 |
RSL |
First Choice |
Across Wales' Local Authorities |
Generate Energy - Affordable Warmth, fit PV array and battery storage solutions to 60 social homes throughout Wales. They currently accommodate adults with a disability. The scheme will target a number of agendas including fuel poverty, tenant well being and affordability. |
60 |
414,736 |
RSL |
Hafod |
Merthyr Tydfil |
59 flats with large communal areas. They have a communal kitchen and laundry flats. The scheme was built in 2012. Looking to install PV and batteries into the communal supply that feeds the flats and communal area |
59 |
100,000 |
RSL |
Linc |
Newport |
A path to universal basic heat! heating improvement measures and, where necessary, fabric improvement measures which will enable the occupier to maintain a minimum heat setting of 18 degrees, thus leading to improved health benefits and enabling residents to be free of fuel poverty. The project supports foundation economy principles through specification of Welsh products and involvement of SME’s were hyper local procurement and upskilling are undertaken |
119 |
540,000 |
RSL |
Merthyr Valley Ho |
Merthyr Tydfil |
Low Carbon EWI |
80 |
339,000 |
RSL |
Newydd |
Rhondda Cynon Taff and Vale of Glamorgan |
Low embodied carbon loft insulation |
80 |
20,000 |
RSL |
Newydd |
Rhondda Cynon Taff & Vale of Glamorgan |
Solar PV with battery backup and IES install, working with a local Welsh manufacturer to install integrated Solar PV with Battery backup across our worst performing stock |
40 |
454,775 |
RSL |
North Wales Housing |
Across North Wales |
Cavity wall insulation (polybead) to fifty properties Internal wall insulation to eighty properties External wall insulation to one large historic stone detached bungalow housing a number of residents with high physical and learning difficulty needs (aerogel) |
131 |
373,363 |
LA |
Pembrokeshire |
Pembrokeshire |
Installation of PV, battery storage mechanical ventilation with heat recovery to a selection of properties. |
50 |
298,000 |
LA |
Pembrokeshire |
Pembrokeshire |
Study and installation of high performance composite (aluminium clad timber frame) triple glazed windows. Encompassing Construction and Embodied carbon and the impact on Operational Carbon savings compared with the previously proposed replacement standard uPVC double glazing in a complex of 23 low rise sheltered housing flats |
23 |
69,500 |
RSL |
Pobl |
Swansea |
Installing rooftop PV and in-home batteries, financial benefit of onsite renewable generation will be shared across the community so those with unsuitable roofs for PV installation are not disadvantaged.Heating controls integrated to the existing homes’ systems and the Building Energy Engine will be installed as part of this project |
557 |
808,207 |
RSL |
Pobl |
Across South Wales |
Vulnerable Households Energy Intervention Project - Working in partnership with Warm Wales, Pobl will provide a series of holistic interventions including loft insulation top ups to 300mm with loft storage, LED lighting, and the provision of tailored energy saving information, advice, signposting and support for each household to achieve income maximisation/financial resilience, improved home energy efficiency, lower fuel costs, reduced carbon emissions and improved health and wellbeing |
250 |
87,500 |
RSL |
Pobl |
Newport |
A pilot to explore ways that homes in Newport can be retrofitted with heating improvement measures and, where necessary, fabric improvement measures which will enable the occupier to maintain a minimum heat setting of 18 degrees, thus leading to improved health benefits and enabling residents to be free of fuel poverty. The project supports foundation economy principles through specification of Welsh products and involvement of SME’s were hyper local procurement and upskilling are undertaken. The outcome will help shape all parties’ educational journey on how correct usage of heat models can ensure efficient and effective heating within the home |
150 |
450,000 |
RSL |
Pobl |
Carmarthenshire |
1970’s - 2 and 3 storey apartment blocks. Fabric first approach, installing EWI and warm roof. 12 remaining Economy 7 electric storage heating replaced with air source heat pumps. New heating systems to be compared with gas heated homes to evaluate whether ASHP’s deliver affordable heating. Existing gas heating will be replaced at the end of economic life (approximately 10 years) with a low carbon alternative, thus following the creation & use of property passports. The flat roof of the blocks will have PV array & battery storage to generate electricity for communal areas. Communal EV charging to be installed. |
32 |
4,939,699 |
RSL |
RHA |
Rhondda Cynon Taff |
Installation of 3.3kw Solar PV and 5.2kw. All are the same 3 bed house with a south east facing roof. Welsh manufactured solar PV |
14 |
124,839 |
RSL |
Taff |
Cardiff |
Installation of solar panels with battery back up |
10 |
100,000 |
RSL |
Taff |
Cardiff |
Researching via the IES system to ensure the suitability of the properties for either EWI or IWI |
4 |
25,000 |
RSL |
Tai Calon |
Blaenau Gwent |
use of non-fossil fuel EWI |
92 |
1,462,762 |
RSL |
Tai Tarian |
Neath Port Talbot |
Fabric insulation & ventilation - Undertake fabric improvement works utilising different materials and systems on different architypes to determine the best low carbon material selection whilst improving the thermal performance of each property |
150 |
1,070,000 |
RSL |
Tai Tarian |
Neath Port Talbot |
Undertake pathfinder retrofit to void properties to include the provision of EWI + IWI, floor insulation, new heating, the installation of PV and battery along with a ventilation strategy to compliment the improvement works. |
45 |
1,030,000 |
RSL |
Tai Tarian |
Neath Port Talbot |
Tenant Energy Optimisation Programme and R&D woodfibre and laser scanning |
|
288,485 |
RSL |
United Welsh |
Cardiff |
Scheme comprises three blocks of single-storey flats of early 1980’s construction. Particularly prone to condensation damp and mould reflected in high repairs demand for these problems. Aim is to deliver affordable warmth and thereby improve the quality of the internal environment within each dwelling installation of MVHR systems and PV generation. The compact and contained nature of the site lends itself to “socialised” energy generation and we want to explore this and we particularly want to test how solar PV can be successfully delivered on flatted blocks. |
25 |
198,165 |
RSL |
United Welsh |
Caerphilly |
Scheme comprises a relatively contained community of pre WW1 terraced former miners’ cottages of solid wall construction. Particularly prone to condensation damp and mould reflected in high repairs demand for these problems. Aim is to improve the internal environment within each dwelling by making heat more affordable through improvements to external fabric and deliver energy generation. The compact and contained nature of the site lends itself to “socialised” energy generation and we want to explore this. |
64 |
970,983 |
RSL |
Valleys 2 Coast |
Bridgend |
There are 3 elements to this scheme;
|
163 |
489,300 |
RSL |
Valleys 2 Coast |
Bridgend |
The scheme will provide significant fabric upgrades at the most beneficial time – when properties are void and require a range of replacement and repair works. This approach will:
|
30 |
441,000 |
RSL |
Wales & West |
Ceredigion |
This scheme comprises of 23 properties which are currently rely on solid fuel to provide heating and hot water. The build dates of the properties range between pre-1900’s to post 1990.Our proposal is to replace the solid fuel appliances with a low carbon air source heat pump system. In addition, the schemes will also have PV & Battery Storage systems installed to further reduce energy usage and help reduce energy bills for the residents. |
23 |
374,200 |
RSL |
Wales & West |
Cardiff / Ceredigion |
The project is in two parts
|
48 |
103,600 |
RSL |
Wales & West |
Carmarthenshire |
The project is in two parts
|
25 |
472,706 |