We want to improve safety and journey times along the A55 (junctions 14 and 15).

First published:
23 March 2021
Last updated:

For traffic news visit Traffic Wales.

What we are doing

We will replace the roundabout at junction 15 (Llanfairfechan) with a height separated junction.

Traffic will join the trunk road via a slip road instead of a roundabout.

We will also be improving junction 14 (west of Llanfairfechan). This will allow traffic on the A55 to flow more smoothly without having to slow down at a roundabout.

Current progress

We agreed a single option strategy for junctions 14 and 15.

We have published a protected route plan.

We appointed Carillion PLC, supported by Ramboll (UK), as design and build contractor in autumn 2017. We held public exhibitions between late 2017 and summer 2018.

Following Carillion PLC’s liquidation we appointed Ramboll (UK). They will complete the preliminary design and take the scheme through the statutory process.

Ramboll (UK) have completed the outline design and detailed environmental impact assessment. This has identified the land needed to go ahead with the project.

Timetable

Option and design development: autumn 2017 to winter 2020
Statutory process and public enquiry: winter 2020/21 to winter 2021/22
Detailed design and construction: 2021/22 to 2023

Next steps

We will publish the draft orders including details on the area of land needed.

The Inspector will produce a report on their recommendations. We will consider the findings of this report before deciding whether to make the Orders.

How we consulted

We held stakeholder workshops in summer 2008 and a public information event in late 2017.

We held a 12 week consultation exercise in summer 2018.

Find out more

Further information can be found on the A55 micro-site.

Our Project Liaison Officer can be contacted on mobile: 07840 330238