This draft Order, if made, would authorise the changes needed to local highways and private means of access in connection with the proposed A465 Dowlais Top and Hirwaun Improvement.
Documents
Variation order 2020 , file type: PDF, file size: 373 KB
Variation order 2020: cover sheet , file type: PDF, file size: 62 KB
Variation order 2020: plans , file type: PDF, file size: 20 MB
Variation order 2020: schedule , file type: PDF, file size: 135 KB
Variation order 2020: public notice , file type: PDF, file size: 529 KB
Details
The Welsh Ministers are considering implementing a project for the improvement of the A465 Dowlais Top to Hirwaun.
The title of the order is:
The Neath to Abergavenny trunk road (A465) (Abergavenny to Hirwaun Dualling and Slip Roads) and east of Abercynon to east of Dowlais trunk road (A4060) and Cardiff to Glan Conwy trunk road (A470) (connecting roads) (Dowlais Top to Hirwaun) (side roads) Order 2019 (variation) Order 2020.