Skip to content

Decision on recovered appeal: A biomass energy development at Peboc, Llangefni Industrial Estate, Llangefni, Isle of Anglesey.

Related Links

Tell us if you want any of the documents on this page in an alternative format.
The appeal is dismissed (planning permission refused).

The planning appeal was subject to a public inquiry. The Inspector appointed to hold the inquiry prepared a report for the Minister for Housing and Regeneration.

The Minister accepted the Inspector’s recommendation that the appeal be dismissed.

The Decision Letter contains the reasoning behind the Minister’s decision to dismiss the appeal.

The Decision Letter and the Inspector’s Report can be found below.

Document Download

PDF Document (MFS)
Inspector's report (File size: 532KB)