Skip to content

Welsh Government Sprinkler Pilot Study Interim Report

Related Links

Tell us if you want any of the documents on this page in an alternative format.
The Interim Sprinkler Pilot Study Report contains the methodology, analysis, findings and interim conclusions based on learning experiences to November 2015.
There are 12 schemes involved in the pilot study, with 177 sprinkler installations throughout Wales. 11 of the schemes have commenced on site and 6 are at first fix sprinkler installation stage.

Document Download